PT SuryaTek took care of all document necesary to get approval and permission of the PLN to install the PV System. 

 

 

One of these documents is the so called SLD, Single Line Diagram.

    ptasin01
       
  Installation of the aluminium mounting system. The system is mounted with special klip lok roof lock's. For this system it's not necesary to drill holes in the roof.    ptasin02
       
  In total 12 PV Modules are being installed. Devided over 4 strings. Each module is 260 Watt. Total capacity PV System 3,120 Watt.     ptasin03
       
  PV Combiner Box 4 Strings in 1 out.     ptasin04
       
  Growatt Hybrid 3000 Watt inverter. Capacity Batterybank 28.8 kWh    ptasin05
       
  Combined enclosure box for MCB, SPD and fuses for PV Modules and battery bank    ptasin06
       
  After the installation is completed all connecctions will be checked on voltage and Amps. A complete inspection report will be presented.    ptasin07
       
  The System is connected to the Internet Portal. The PV System can be monitored everywhere in the world    ptasin09
       
       
       
  Jump Directly to other Example Projects    
       
  5,2 MW (5,200,000 Watt) PV System East Java    
  2000 Watt SMK GPRI 3 Malang Self Consuming
   
  5300 Watt Hybrid PV System Bali
   
  5200 Watt Grid Tied PV System Bali Netmetering
   
  EXIM Meter approved by the PLN for 26.5 KW PV System
   
  10000 Watt PV System Grid Tied 3 Phase Netmetering Bali
   
  3000 Watt Hybrid PV System Bekasi Java
   
  3000 Watt Hybrid PV System Yogyakarta Java
   
  3120 Watt Hybrid PV System Yogyakarta Java    
  3000 Watt On Grid PV System Netmetering Bekasi Java
   
  1500 Watt On Grid PV System Self Consuming
   
  100 kWp On Grid PV Systeem Jakarta Self Consuming
   
  1 MW On Grid PV System La Bangka NTB
   
  15kWp Off Grid Water Pumping in Sumba
   
  36kWp On Grid Carport Karawang -West Java
   
  150 kWp Off Grid Banyuasin, Palembang
   
  15 kWp On Grid PLN Kapuas Pontianak, Kalimantan
   
  50 kWp On Grid PLN Tahuna island, North Sulawesi
   
  25 kWp On Grid Carport Solarlog Bogor
   
       
  Contact us
   
       
  Home    

 

 

Opening Hours

30 days a month we are ready to serve our customers.             

  
Monday - Friday 09:00 am – 17:00 am
Saturday   09:00 am – 12:00 noon

Contact Us 

Mobile +62 856-4527-9818 
Office +62 31 5116 1496

 

Office Location

Feel free to contact us if you have any questions.

Surabaya:

Puri Safira Regency

Cluster De Armilla block D 8 Nr 14

Jalan Raya Menganti Kecamatan Menganti-Gresik

61174 East Java Indonesia

Contact Us