EXIM Meter approved by the PLN for 31.8 KW PV System | |||
To get permission for the installation of a PV System you must apply at the PLN Office of your residency. If you don't ask for the permission you risc high penalties from the PLN and you willl nog have your EXIM meter installed. The installation must meet the requirements of the SPLN 2015. |
|||
The PLN will check your PV System on many parameters as specified in the Standard PLN 2015 (SPLN) | |||
The PLN is doeing this to protect their infrastructure. For example the cheaper inverters don't give a very stable feed in. This may interfere with the grid of the PLN and can lead up to dangerous situations | |||
PT SuryaTek has a lot of experience with the whole process with the PLN. We always coordinate this process for our clients. On bahave of our clients. | |||
After approval of the PV System by the PLN they will install your EXIM meter within a period of 3 weeks. | |||
Once the EXIM Meter is up and running you will recieve a adapted PLN bill. On the bill the amount of electricity that your system exported to the PLN Grid can be seen. | |||
Click to Enlarge | |||
Jump Directly to other Example Projects | |||
5,2 MW (5,200,000 Watt) PV System East Java | |||
2000 Watt SMK GPRI 3 Malang Self Consuming |
|||
5300 Watt Hybrid PV System Bali |
|||
5200 Watt Grid Tied PV System Bali Netmetering |
|||
EXIM Meter approved by the PLN for 26.5 KW PV System |
|||
10000 Watt PV System Grid Tied 3 Phase Netmetering Bali |
|||
3000 Watt Hybrid PV System Bekasi Java |
|||
3000 Watt Hybrid PV System Yogyakarta Java |
|||
3120 Watt Hybrid PV System Yogyakarta Java | |||
3000 Watt On Grid PV System Netmetering Bekasi Java |
|||
1500 Watt On Grid PV System Self Consuming |
|||
100 kWp On Grid PV Systeem Jakarta Self Consuming |
|||
1 MW On Grid PV System La Bangka NTB |
|||
15kWp Off Grid Water Pumping in Sumba |
|||
36kWp On Grid Carport Karawang -West Java |
|||
150 kWp Off Grid Banyuasin, Palembang |
|||
15 kWp On Grid PLN Kapuas Pontianak, Kalimantan |
|||
50 kWp On Grid PLN Tahuna island, North Sulawesi |
|||
25 kWp On Grid Carport Solarlog Bogor |
|||
Contact us |
|||
Home |