5200 Watt Grid Tied PV System Netmetering Bali | |||
PT SuryaTek took care of all document necesary to get approval and permission of the PLN to install the PPV System.
One of these documents is the so called SLD, Single Line Diagram.
|
|||
Installation of the metal frames. They have been taylor made. Sometimes we use metel frames in stead of aluminium to reduce the investment. | |||
Once the metal frames are installed the aluminium mounting rails are mounted to the frames | |||
We use WeeB Connectors (Washer, Electrical Equipment Bonding) and Jumpers to make sure all metal parts are grounded. All our systems are installed fully grounded for your safety | |||
Installing the 20 PV Modules. In total 5200 Watt. The design was set up with two MPPT. So two strings are being installed | |||
Micro Circuit Breakers (MCB) and Surge Protection Devices (SPD) to make the installation a save installation.
All our systems will be delivered with full labeling for optimum safety |
|||
ICA 5000 Wat Single Phase Inverter Dual MPPT | |||
Checkup of the system done by the PLN. They will technically check the complete system. After approval the PLN will install the EXIM meter within a periode of 3 weeks. | |||
The System is connected to the Internet Portal. From anywhere in the world the PV System can be monitored | |||
ICA 260 Watt Poly PV modules. Total installed 20 pieces. Total cappacity of the PV System 5200 Watt. The owner needs to do some cutting of bushes and threes. | |||
Jump Directly to other Example Projects | |||
5,2 MW (5,200,000 Watt) PV System East Java | |||
2000 Watt SMK GPRI 3 Malang Self Consuming |
|||
5300 Watt Hybrid PV System Bali |
|||
5200 Watt Grid Tied PV System Bali Netmetering |
|||
EXIM Meter approved by the PLN for 26.5 KW PV System |
|||
10000 Watt PV System Grid Tied 3 Phase Netmetering Bali |
|||
3000 Watt Hybrid PV System Bekasi Java |
|||
3000 Watt Hybrid PV System Yogyakarta Java |
|||
3120 Watt Hybrid PV System Yogyakarta Java | |||
3000 Watt On Grid PV System Netmetering Bekasi Java |
|||
1500 Watt On Grid PV System Self Consuming |
|||
100 kWp On Grid PV Systeem Jakarta Self Consuming |
|||
1 MW On Grid PV System La Bangka NTB |
|||
15kWp Off Grid Water Pumping in Sumba |
|||
36kWp On Grid Carport Karawang -West Java |
|||
150 kWp Off Grid Banyuasin, Palembang |
|||
15 kWp On Grid PLN Kapuas Pontianak, Kalimantan |
|||
50 kWp On Grid PLN Tahuna island, North Sulawesi |
|||
25 kWp On Grid Carport Solarlog Bogor |
|||