100 kWp On Grid PV Systeem Jakarta Self Consuming | |||
Installation of 100 kWp grid tied PV System It's a selfconsuming PV System. This means that the daily yield will be completely consumed by the office building during daylight.
There will be no export of excess energy to the PLN Grid. An EXIM meter is not necesary. |
|||
In total 338 PV Modules are being installed. Each module is 295 Watt. Total capacity PV System 100 kWp. | |||
In total 338 PV Modules are being installed. Each module is 295 Watt. Total capacity PV System 100 kWp. | |||
Installing 10 x Fronis IG-Plus. The inverters are connected in parallel to the PLN Grid. | |||
Micro Circuit Breakers (MCB) and Surge Protection Devices (SPD) to make the installation a save installation | |||
All inverters in parallel connected to the PLN Grid. | |||
All set! System up and running | |||
The System is connected to the Internet Portal. Special software of Solarlog is being used to monitor bigger PV Plants with multiple inverters. The PV System can be monitored everywhere in the world | |||
Totally installed 10 x Fronius IG_Plus 10KW inverter. 338 pieces Panasonis HIT 295 Wp Mono. | |||
Jump Directly to other Example Projects | |||
5,2 MW (5,200,000 Watt) PV System East Java | |||
2000 Watt SMK GPRI 3 Malang Self Consuming |
|||
5300 Watt Hybrid PV System Bali |
|||
5200 Watt Grid Tied PV System Bali Netmetering |
|||
EXIM Meter approved by the PLN for 26.5 KW PV System |
|||
10000 Watt PV System Grid Tied 3 Phase Netmetering Bali |
|||
3000 Watt Hybrid PV System Bekasi Java |
|||
3000 Watt Hybrid PV System Yogyakarta Java |
|||
3120 Watt Hybrid PV System Yogyakarta Java | |||
3000 Watt On Grid PV System Netmetering Bekasi Java |
|||
1500 Watt On Grid PV System Self Consuming |
|||
100 kWp On Grid PV Systeem Jakarta Self Consuming |
|||
1 MW On Grid PV System La Bangka NTB |
|||
15kWp Off Grid Water Pumping in Sumba |
|||
36kWp On Grid Carport Karawang -West Java |
|||
150 kWp Off Grid Banyuasin, Palembang |
|||
15 kWp On Grid PLN Kapuas Pontianak, Kalimantan |
|||
50 kWp On Grid PLN Tahuna island, North Sulawesi |
|||
25 kWp On Grid Carport Solarlog Bogor |
* PT SuryaTek participated as sub-contractor | ||
Contact us |
|||
Home |